Final | 7/2/2015 | 7/2/2015 | 7/2/2015 | P | PASS |
Jim Little
|
|
|
|
Water and/or Sewer | 7/2/2015 | 7/2/2015 | 7/2/2015 | A | CANC |
Jim Little
|
|
|
Please come after 10:00 Phone #: ###-#### Inspection requested via web by Erin Whiting=======canceled by JL and changed to final PM insp per contractor.
|
Water and/or Sewer | 7/1/2015 | 7/1/2015 | 7/1/2015 | P | CANC |
Jim Little
|
|
|
Please call me if there is a problem. Thanks Phone #: ###-#### Inspection requested via web by Erin Whiting
|
Final | 6/30/2015 | 7/1/2015 | 7/1/2015 | A | FAIL |
Jim Little
|
|
|
Please come first thing after 8:00 Thanks Phone #: ###-#### Inspection requested via web by Erin Whiting====Need tempering valves on lavs to prevent hot water from exceeding 120 degrees
|
Plumbing Rough-in | 4/9/2015 | 4/9/2015 | 4/9/2015 | P | PASS |
Jim Johnson
|
|
|
inspect early afternoon if possible Thanks. Phone #: ###-#### >> Inspection requested via web by Erin Whiting
|
Groundwork | 3/12/2015 | 3/12/2015 | 3/12/2015 | P | PASS |
Jim Johnson
|
|
|
Steven ###-####
|