Final | 6/19/2015 | 6/22/2015 | 6/22/2015 | A | PASS |
Eric Strole
|
|
|
Contact Tom with questions Phone #: ###-#### Inspection requested via web by Nick Drake
|
Final | 6/18/2015 | 6/18/2015 | 6/18/2015 | P | FAIL |
Eric Strole
|
|
|
T&P requires a minimum of a 1" airgap at flr sink. Pvc is not an approved material for the T&P discharge.
|
Water and/or Sewer | 6/17/2015 | 6/18/2015 | 6/18/2015 | P | CANC |
Eric Strole
|
|
|
FINAL PLUMBING INSPECTION Phone #: ###-#### Inspection requested via web by Nick Drake
|
Water and/or Sewer | 6/3/2015 | 6/3/2015 | 6/3/2015 | P | FAIL |
Bill VanDegrift
|
|
|
Final inspection please! Phone #: ###-#### Inspection requested via web by Nick Drake 1) provide health department approved plan showing deletion of fixtures 2) provide access to remove upper water heater 3) upper water heater seems to be leaking, needs pan drain and t&p ran to an approved location 4)test all backflow preventers 5) provide access to premise protection 6) turn t&p drain from lower water heater down
|
Other | 5/21/2015 | 5/22/2015 | 5/22/2015 | A | DONE |
Eric Strole
|
|
|
MEETING WITH TOM FARMER Phone #: ###-#### Inspection requested via web by Nick Drake-This was a conferance on backflows.
|
Plumbing Rough-in | 3/27/2015 | 3/27/2015 | 3/27/2015 | P | PASS |
Eric Strole
|
|
|
Please call Tom Farmer at ###-#### before heading out. Thank you!! Jennifer @ Drake Mechanical Phone #: ###-#### Inspection requested via web by Nick Drake
|
Plumbing Rough-in | 3/26/2015 | 3/27/2015 | 3/27/2015 | A | CANC |
Eric Strole
|
|
|
Please call Tom Farmer at ###-#### when you are on your way out. Thank you!!! Jennifer @ Drake Mechanical Phone #: ###-#### >> Inspection requested via web by Nick Drake Inspection cancelled from web by: Nick Drake
|
Groundwork | 3/26/2015 | 3/26/2015 | 3/26/2015 | P | PASS |
Eric Strole
|
|
|
Please call Tom Farmer at ###-#### when on you are on your way out. Thank you! Jennifer @ Drake Mechanical Phone #: ###-#### Inspection requested via web by Nick Drake
|