Final | 7/8/2015 | 7/9/2015 | 7/9/2015 | A | PASS |
Daryl Spivey
|
|
|
Please call Rusty Karel when you are headed to the job site. He would like to be present for inspection. ###-#### Phone #: ###-#### Inspection requested via web by Rusty Karel
|
Water and/or Sewer | 6/16/2015 | 6/16/2015 | 6/16/2015 | A | CANC |
Daryl Spivey
|
|
|
AM if possible. We will be there at approx 9am. Pressure witness for sewer and vent piping. Phone #: ###-#### Inspection requested via web by Rusty Karel
|
Groundwork | 6/16/2015 | 6/16/2015 | 6/16/2015 | A | PART |
Daryl Spivey
|
|
|
AM if possible. We will be there at approx 9am. Pressure witness for sewer and vent piping. Phone #: ###-#### Inspection requested via web by Rusty Karel installed dual ejector and waste over to existing piping..........ds
|
Other | 4/10/2015 | 4/14/2015 | 4/14/2015 | A | PASS |
Daryl Spivey
|
|
|
Pre-contruction meeting with Rusty Karel at job site. Would prefer a mid-morning meeting. Please call Rusty 30 minutes ahead so he can drive from Meridian to the job site. Phone #: ###-#### Inspection requested via web by Rusty Karel wanting to put ejector in basement which is ok but want to also drain upstairs restroom into pump. Would rather gravity drain if possible but if it goes to pump then it needs to be a dual pump.............ds
|