Final | 8/5/2015 | 8/5/2015 | 8/5/2015 | P | PASS |
Jim Little
|
|
|
Travis, ###-####=========final ok, no card onsite.
|
Water and/or Sewer | 8/4/2015 | 8/4/2015 | 8/5/2015 | P | PASS |
Jim Little
|
|
|
travis ###-####, turn up future wye for c/o, sewer ok
|
Final | 8/4/2015 | 8/4/2015 | 8/4/2015 | P | FAIL |
Jim Little
|
|
|
travis ###-####=====need tempering device on hand wash sinks per 413.1
|
Plumbing Rough-in | 7/6/2015 | 7/7/2015 | 7/7/2015 | P | PASS |
Jim Little
|
|
|
Phone #: ###-#### Inspection requested via web by Rob Bristol========4" stack for future baths upstairs ok to backfill and cover.
|
Plumbing Rough-in | 6/29/2015 | 6/29/2015 | 6/29/2015 | P | PASS |
Jim Little
|
|
|
Phone #: ###-#### Inspection requested via web by Rob Bristol
|
Water and/or Sewer | 5/4/2015 | 5/4/2015 | 5/4/2015 | P | PART |
Bill VanDegrift
|
|
|
Phone #: ###-#### Inspection requested via web by Rob Bristol water service ok
|
Groundwork | 4/29/2015 | 4/30/2015 | 4/30/2015 | A | PASS |
Jim Johnson
|
|
|
Phone #: ###-#### >> Inspection requested via web by Rob Bristol
|