Final | 12/29/2015 | 12/29/2015 | 12/29/2015 | P | PASS |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by steven smith
|
PLM-Aging Inspection | 11/4/2015 | 11/4/2015 | 11/4/2015 | | PART |
Eric Strole
|
|
|
wip
|
Plumbing Rough-in | 8/5/2015 | 8/6/2015 | 8/6/2015 | A | PASS |
Eric Strole
|
|
|
please call when in route to jobsite Phone #: ###-#### Inspection requested via web by steven smith
|
Plumbing Rough-in | 7/15/2015 | 7/15/2015 | 7/16/2015 | P | FAIL |
Jim Little
|
|
|
Phone #: ###-#### Inspection requested via web by steven smith=========1)PLUMB ALL HORIZONTAL WET VENTS PER 2009 ISPC. 2) ALL VENTS NEED TO BE LEVEL OR GRADED BACK. 3) AAV'S FOR ISLAND FIXTURES ONLY. 4) SUPPORT DWV EVERY 4' 5) 35 DFU'S ON 3" HORIZONTAL IS MAX,EJECTOR COUNTS AS 20 DFU'S. 6) DWV TEST FAIL. 7) MISSING NAIL PLATES. 8) NEED TO COMPLETE ALL ROUGH IN. CORRECTION NOTICE POSTED ONSITE.
|
Plumbing Rough-in | 7/14/2015 | 7/14/2015 | 7/14/2015 | P | NR |
Jim Little
|
|
|
Phone #: ###-#### Inspection requested via web by steven smith
|
Groundwork | 4/29/2015 | 4/30/2015 | 4/30/2015 | A | PASS |
Jim Johnson
|
|
|
Phone #: ###-#### >> Inspection requested via web by steven smith
|