Final | 7/15/2015 | 7/15/2015 | 7/15/2015 | P | PASS |
Jim Little
|
|
|
Backflow has been relocated, re-tested and temp mixing valves have been locked and tagged. Thanks. Scott. Phone #: ###-#### Inspection requested via web by Scott Sparrell=====CORRECTIONS MADE
|
Final | 7/14/2015 | 7/14/2015 | 7/14/2015 | P | FAIL |
Jim Little
|
|
|
Corrections have been made and is ready for re-inspection Phone #: ###-#### Inspection requested via web by Scott Sparrell======DCVA NEEDS TO BE READLY ACC. TEMP VALVES ON (2) WH NEED SET, LOCKING C CLIP AND TAG T MEET ASSE 1070, PER 413.1
|
Final | 7/3/2015 | 7/6/2015 | 7/6/2015 | A | FAIL |
Jim Little
|
|
|
Job is ready for final. Contractor will be on site. Phone #: ###-#### Inspection requested via web by Scott Sparrell=====Pipe t&p outside, temper all faucets per 413.1,need open front water closet seats, Shower not done, backflow protection, correction notice left on WH
|
Plumbing Rough-in | 5/28/2015 | 5/28/2015 | 5/28/2015 | P | PASS |
Daryl Spivey
|
|
|
Hasib will be on site in afternoon. Plumbing will be under test. Phone #: ###-#### Inspection requested via web by Scott Sparrell
|