Final | 8/5/2015 | 8/6/2015 | 8/6/2015 | A | PASS |
Jim Little
|
|
|
if questions call Jerry @ ###-#### Phone #: ###-#### Inspection requested via web by Stacia Haumann
|
Final | 8/4/2015 | 8/5/2015 | 8/5/2015 | A | FAIL |
Jim Little
|
|
|
if questions call Jerry @ ###-####. Phone #: ###-#### Inspection requested via web by Stacia Haumann 1. lav faucets must comply with 413.1 UPC, they need to be ASSE 1070 or CSA B125.3 certified or device installed that is. (tempering valve)
2. water closet leaking
|
Plumbing Rough-in | 7/7/2015 | 7/8/2015 | 7/8/2015 | A | PASS |
Jim Little
|
|
|
Questions call Gary ###-#### Phone #: ###-#### Inspection requested via web by Stacia Haumann
|
Plumbing Rough-in | 7/7/2015 | 7/7/2015 | 7/7/2015 | P | FAIL |
Jim Little
|
|
|
rescheduled from am that was NR=========missing nail plates on DWV, ok to pull test, schedule reinsp when done.
|
Plumbing Rough-in | 7/6/2015 | 7/7/2015 | 7/7/2015 | A | NR |
Jim Little
|
|
|
if questions call Gary @ ###-#### Phone #: ###-#### Inspection requested via web by Stacia Haumann=========NR, moved to pm
|
Groundwork | 6/8/2015 | 6/9/2015 | 6/9/2015 | A | PASS |
Jim Little
|
|
|
underground waste. if questions call Jerry @ ###-#### Phone #: ###-#### Inspection requested via web by Stacia Haumann
|