Sprinkler (Final) | 7/9/2015 | 7/9/2015 | 7/9/2015 | P | PASS |
Jim Little
|
|
|
in the area and checked to see if corretions were made.
|
Sprinkler (Final) | 6/29/2015 | 6/30/2015 | 6/30/2015 | A | FAIL |
Jim Little
|
|
|
Ryan Phone #: ###-####=====1)Cannot have cappped of opening upstream of RP, this creates a potential for a cross connection. 2) bottom of RP must be 12" minimum above ground. 3) adjust BV handle so it will open fully.
|