Water Heater Final | 7/14/2015 | 7/16/2015 | 7/16/2015 | P | PASS |
Jim Little
|
|
|
Correction being done in late AM. Installer will call you when close to being done so hopefully you can go over there and inspect while door if off. Phone #: ###-#### Inspection requested via web by Mary LaFayette
|
Water Heater Final | 7/13/2015 | 7/14/2015 | 7/14/2015 | A | FAIL |
Jim Little
|
|
|
Please meet our installer at home at 9 AM and he will unscrew panel for you. Phone #: ###-#### Inspection requested via web by Mary LaFayette====T&P VALVE AND PAN DRAIN NEED TO BE PIPED TO THE OUTSIDE.
|
Final | 6/24/2015 | 6/30/2015 | 6/30/2015 | A | CANC |
Jim Little
|
|
|
Phone #: ###-#### Inspection requested via web by Mary LaFayette==changed to water heater final inspection.
|
Water Heater Final | 6/30/2015 | 6/30/2015 | 6/30/2015 | P | FAIL |
Jim Little
|
|
|
Phone #: ###-#### Inspection requested via web by Mary LaFayette====plumber needs to provide access to water heater located behind panel sealed with screws,
|