DOC - Permit Finaled | 10/5/2015 | 10/5/2015 | 10/5/2015 | P | PASS |
Jim Little
|
|
|
|
Water and/or Sewer | 10/5/2015 | 10/5/2015 | 10/5/2015 | A | PASS |
Jim Little
|
|
|
final hookup of sewer and water
|
DOC - Permit Finaled | 7/1/2015 | 7/1/2015 | 7/1/2015 | P | PASS |
Jim Little
|
|
|
|
Water and/or Sewer | 6/30/2015 | 7/1/2015 | 7/1/2015 | A | PASS |
Jim Little
|
|
|
Water and Sewer Line Inspection Phone #: ###-#### Inspection requested via web by Vicki Tallent,=====corrections completed
|
Water and/or Sewer | 6/29/2015 | 6/30/2015 | 6/30/2015 | A | FAIL |
Jim Little
|
|
|
Water and Sewer Line Inspection Phone #: ###-#### Inspection requested via web by Vicki Tallent====1) No test on water. 2) need tracer wire on water. 3) cannot embed water line directly in concrete. 4) Sewer test under 5psi
|