Final | 11/16/2015 | 11/16/2015 | 11/16/2015 | P | PASS |
Daryl Spivey
|
|
|
Kitchen and basement bathroom ready. Call for lock box code and location when on site. Thanks Scott. Phone #: ###-#### Inspection requested via web by Scott Sparrell
|
PLM-Aging Inspection | 11/2/2015 | 11/2/2015 | 11/2/2015 | | PEND |
Daryl Spivey
|
|
|
|
Plumbing Rough-in | 7/24/2015 | 7/24/2015 | 7/24/2015 | P | PASS |
Daryl Spivey
|
|
|
Rough in is complete and under test. Hasib is contact if questions. Thanks. Scott. Phone #: ###-#### Inspection requested via web by Scott Sparrell
|
Plumbing Rough-in | 7/23/2015 | 7/23/2015 | 7/23/2015 | P | NR |
Daryl Spivey
|
|
|
Would like to meet with inspector to go over venting limitations for remodel due to finished space above kitchen on main level and basement tie ins. Hasib will be on site to explain. Thanks. Scott. Phone #: ###-#### Inspection requested via web by Scott Sparrell stopped by for conference........ds
|
Groundwork | 7/14/2015 | 7/14/2015 | 7/14/2015 | P | PASS |
Daryl Spivey
|
|
|
Basement bathroom groundwork for toilet, shower and lavatory Phone #: ###-#### Inspection requested via web by Scott Sparrell
|