Final | 8/19/2015 | 8/19/2015 | 8/19/2015 | P | PASS |
Eric Strole
|
|
|
|
Final | 8/17/2015 | 8/17/2015 | 8/17/2015 | P | PART |
Eric Strole
|
|
|
Need to install all equipment. Temp final ok.
|
Final | 8/17/2015 | 8/17/2015 | 8/17/2015 | A | NR |
Eric Strole
|
|
|
Will be ready by 11 am. Please contact Jeremy. Thank you Phone #: ###-#### Inspection requested via web by Rena Scott-Not ready
|
Plumbing Rough-in | 7/29/2015 | 7/30/2015 | 7/30/2015 | P | PASS |
Eric Strole
|
|
|
Please contact Jeremy to coordinate. Phone #: ###-#### Inspection requested via web by Rena Scott
|
Groundwork | 7/17/2015 | 7/17/2015 | 7/17/2015 | P | PASS |
Eric Strole
|
|
|
|
Water and/or Sewer | 7/17/2015 | 7/17/2015 | 7/17/2015 | P | CANC |
Eric Strole
|
|
|
Underground plumbing will be ready for inspection at around 3 pm. If you would like you can call before heading out.
Thank you Phone #: ###-#### Inspection requested via web by Rena Scott
|
Other | 7/6/2015 | 7/6/2015 | 7/6/2015 | P | DONE |
Eric Strole
|
|
|
We would like to meet for a job walk of a temporary trailer today at 12 pm to make sure everyone is on the same page. Phone #: ###-#### Inspection requested via web by Rena Scott-This was a conferance on hooking water and sewer up to temp trailer.
|