Final | 9/11/2015 | 9/14/2015 | 9/15/2015 | A | PASS |
Jim Little
|
|
|
Journeyman on job Chad Lewis ###-#### Phone #: ###-#### Inspection requested via web by Candice Martin
>pass per egineered drawing approved by the city.
|
Plumbing Rough-in | 8/18/2015 | 8/19/2015 | 8/19/2015 | P | PART |
Jim Little
|
|
|
Chad Lewis is Journeyman on the job. His cell # is ###-#### Phone #: ###-#### Inspection requested via web by Candice Martin >vents ok to cover > final inspection needed when pumps are wired and engineered drawing on site for pumps.
|
Plumbing Rough-in | 8/18/2015 | 8/19/2015 | 8/18/2015 | A | CANC |
Jim Little
|
|
|
Chad Lewis Journeyman on the job Cell # ###-#### Phone #: ###-#### >> Inspection requested via web by Candice Martin Inspection cancelled from web by: Candice Martin
|
Water and/or Sewer | 7/17/2015 | 7/20/2015 | 7/20/2015 | A | PASS |
Jim Little
|
|
|
Ready for sewer line and ejector line inspection. Phone #: ###-#### Inspection requested via web by Candice Martin======sewer to incp & vent from incp. tank ok. 2" discharge from tank to existing 4" in crawl space ok.
|
Water and/or Sewer | 7/16/2015 | 7/17/2015 | 7/17/2015 | P | FAIL |
Jim Little
|
|
|
Sewer line inspection. Will be ready for afternoon. Phone #: ###-#### Inspection requested via web by Candice Martin===NEED TO VENT TANK SEPATE,
|
Groundwork | 7/14/2015 | 7/15/2015 | 7/15/2015 | A | PASS |
Jim Little
|
|
|
Chad Lewis is journeyman on the job and his cell # is ###-#### Phone #: ###-#### Inspection requested via web by Candice Martin=====GW OK INSIDE BLDG ONLY,
|