Final | 11/4/2015 | 11/4/2015 | 11/4/2015 | A | PASS |
Eric Strole
|
|
|
Final for the b26 trailers. The new toilet and 8 open front seats have been installed. Phone #: ###-#### Inspection requested via web by George Karcher
|
Final | 10/27/2015 | 10/28/2015 | 10/28/2015 | A | PART |
Eric Strole
|
|
|
Call ###-#### or ###-#### Phone #: ###-#### Inspection requested via web by George Karcher-Public bathroom toilets are required to be of the elongated type with open front seats. Temp final ok.
|
Plumbing Rough-in | 9/17/2015 | 9/17/2015 | 9/17/2015 | P | PART |
Eric Strole
|
|
|
Please call ###-#### or cell ###-#### Phone #: ###-#### Inspection requested via web by George Karcher-28 T dwv pass. Water test on 28 T north/east bath and breakroom pass
|
Water and/or Sewer | 9/3/2015 | 9/4/2015 | 9/4/2015 | A | PART |
Eric Strole
|
|
|
Trailer 26T and 27T is ready for final. Need to get rough in inspection for 28T trailer. Phone #: ###-#### Inspection requested via web by George Karcher-27T final pass. 26T Temp finl ok( Need to move filter for coffee upstream of RPBA and need to check ice machine for airgap.) 28T under flr rough-in pass.
|
Final | 8/12/2015 | 8/12/2015 | 8/12/2015 | P | PART |
Eric Strole
|
|
|
call ###-#### Phone #: ###-#### Inspection requested via web by George Karcher-Building 26 & 27 temp final ok.
|
Plumbing Rough-in | 7/16/2015 | 7/16/2015 | 7/16/2015 | A | PART |
Eric Strole
|
|
|
Rough-in trailer 26 T pass
|
Water and/or Sewer | 7/15/2015 | 7/16/2015 | 7/16/2015 | A | CANC |
Eric Strole
|
|
|
call ###-#### Phone #: ###-#### Inspection requested via web by George Karcher
|