Final | 10/9/2015 | 10/9/2015 | 10/9/2015 | P | PASS |
Eric Strole
|
|
|
Backflow has been added Phone #: ###-#### Inspection requested via web by MICHAEL BYERS
|
Final | 9/28/2015 | 9/28/2015 | 9/28/2015 | A | PART |
Eric Strole
|
|
|
All work is complete Phone #: ###-#### Inspection requested via web by MICHAEL BYERS-Need to have all equipment installed before final. Temp final ok.
|
Final | 9/25/2015 | 9/25/2015 | 9/25/2015 | P | PART |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by MICHAEL BYERS-Temp final ok.
|
Final | 9/25/2015 | 9/25/2015 | 9/25/2015 | P | CANC |
Eric Strole
|
|
|
|
Final | 9/24/2015 | 9/24/2015 | 9/25/2015 | P | FAIL |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by MICHAEL BYERS-Need to seperate ice makers & hot water dispensors from the same rpba. Need to add a dbca on vegetable defroster. Need tempered water to all public lavs & hand sinks. T&P lines need an airgap. Need a seperate water line for the soap dispensor at the mop sink. Need to run drain for vegetable defroster & fernco's are only approved for below grade.
|
Plumbing Rough-in | 8/6/2015 | 8/6/2015 | 8/6/2015 | P | PASS |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by MICHAEL BYERS
|
Groundwork | 7/24/2015 | 7/24/2015 | 7/24/2015 | P | PASS |
Eric Strole
|
|
|
Grease interceptor piping only Phone #: ###-#### Inspection requested via web by MICHAEL BYERS-piping at interceptor pass
|
Groundwork | 7/16/2015 | 7/17/2015 | 7/17/2015 | A | PASS |
Eric Strole
|
|
|
|
Groundwork | 7/16/2015 | 7/16/2015 | 7/16/2015 | A | CANC |
Eric Strole
|
|
|
|
Groundwork | 7/16/2015 | 7/16/2015 | 7/16/2015 | P | PART |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by MICHAEL BYERS-Need to use fixture fitting on back to flr drains.
|