DOC - Permit Finaled | 1/25/2016 | 1/25/2016 | 1/25/2016 | P | PASS |
Jim Little
|
|
|
|
PLM-Aging Inspection | 1/25/2016 | 1/25/2016 | 1/25/2016 | | PASS |
Jim Little
|
|
|
work completed
|
Water and/or Sewer | 10/26/2015 | 10/26/2015 | 10/26/2015 | P | PASS |
Jim Little
|
|
|
4" water in front of old bldg ok to cover.
|
Water and/or Sewer | 9/24/2015 | 9/24/2015 | 9/24/2015 | P | PART |
Jim Little
|
|
|
water tie in at bldg carwash on west end. >visual, ok to bury, needs tested still.
|
Water and/or Sewer | 9/23/2015 | 9/23/2015 | 9/23/2015 | A | PART |
Jim Little
|
|
|
sewer and sd test >sewer test on west side, pass >SD test on west side, pass
|
Water and/or Sewer | 9/18/2015 | 9/18/2015 | 9/18/2015 | A | PART |
Jim Little
|
|
|
part sewer insp >visual on 4" ss from showroom fd to incp pass
|
Water and/or Sewer | 8/27/2015 | 8/27/2015 | 8/27/2015 | P | PART |
Jim Little
|
|
|
Trent Phone #: ###-#### >ok to bury last section to car wash.
|
Water and/or Sewer | 8/25/2015 | 8/26/2015 | 8/26/2015 | A | PART |
Jim Little
|
|
|
Steve Phone #: ###-#### >ok to bury once thrust blocks are in place
|
Water and/or Sewer | 8/19/2015 | 8/20/2015 | 8/20/2015 | A | PASS |
Jim Little
|
|
|
check two interceptor tests. >test ok
|
Plumbing Rough-in | 8/18/2015 | 8/19/2015 | 8/19/2015 | A | PART |
Bill VanDegrift
|
|
|
grease trap; Pete Phone #: ###-#### filling two interceptors
|
Roof Drains | 7/31/2015 | 7/31/2015 | 7/31/2015 | P | PART |
Jim Little
|
|
|
Trent ===1. Ok to bury east side RD and trench drain piping out side by carwash. 2. need to do 24 hour water test on both s/o interceptors.
|
Water and/or Sewer | 7/30/2015 | 7/30/2015 | 7/30/2015 | P | NR |
Jim Little
|
|
|
Trent Phone #: ###-####
|
Water and/or Sewer | 7/29/2015 | 7/29/2015 | 7/29/2015 | P | PART |
Jim Little
|
|
|
Trent Phone #: ###-####========water ok, north side of bldg storm drains 3 sets ok to bury, please be sure to fill s/o interceptors with water and schedule an inspection for 24 hour leak test before backfilling s/o interceptors
|