Final | 11/6/2015 | 11/6/2015 | 11/6/2015 | P | PASS |
Jim Little
|
|
|
Phone #: ###-#### Inspection requested via web by steven smith
|
Plumbing Rough-in | 8/3/2015 | 8/4/2015 | 8/4/2015 | A | PASS |
Jim Little
|
|
|
Phone #: ###-#### Inspection requested via web by steven smith
|
Plumbing Rough-in | 8/3/2015 | 8/3/2015 | 8/3/2015 | P | FAIL |
Jim Little
|
|
|
Phone #: ###-#### Inspection requested via web by steven smith======need to strap pex every 32" on overhead by furnace. complete pvc to abs connection. ok to pull test, reinspect when complete
|
Plumbing Rough-in | 7/31/2015 | 7/31/2015 | 7/31/2015 | P | NR |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by steven smith-Not ready
|