Final | 6/1/2016 | 6/1/2016 | 6/1/2016 | P | PASS |
Daryl Spivey
|
|
|
Please call ahead for access - Doug Phone #: ###-####
|
PLM-Aging Inspection | 5/25/2016 | 5/25/2016 | 5/25/2016 | | PEND |
Daryl Spivey
|
|
|
no calls
|
PLM-Aging Inspection | 2/24/2016 | 2/24/2016 | 2/24/2016 | | PEND |
Bill VanDegrift
|
|
|
|
PLM-Aging Inspection | 11/25/2015 | 11/25/2015 | 11/25/2015 | | PEND |
Daryl Spivey
|
|
|
no calls
|
Plumbing Rough-in | 8/12/2015 | 8/12/2015 | 8/12/2015 | A | PASS |
Daryl Spivey
|
|
|
|
Final | 8/10/2015 | 8/11/2015 | 8/11/2015 | A | CANC |
Daryl Spivey
|
|
|
would like call ahead; Martha Phone #: ###-####
|
Plumbing Rough-in | 8/11/2015 | 8/11/2015 | 8/11/2015 | A | FAIL |
Daryl Spivey
|
|
|
would like call ahead; Martha Phone #: ###-#### 2 in. on kitchen with a san tee drain required and vent tub...........ds
|
Plumbing Rough-in | 7/31/2015 | 8/3/2015 | 8/3/2015 | A | FAIL |
Daryl Spivey
|
|
|
Martha ###-#### change out san tees in horizontal drain , combos for k/s and lav, pex pipe on water heater within 18 inches and cannot use pex on t&p, support drain every 4 ft. and hook up tub drain and nail plate..........ds
|