Final | 9/29/2015 | 9/30/2015 | 9/30/2015 | A | PASS |
Daryl Spivey
|
|
|
Other contractors and/or homeowner should be there. If not call Gabe at ###-####. Thanks. Phone #: ###-#### Inspection requested via web by Josh Johnson
|
Plumbing Rough-in | 8/19/2015 | 8/20/2015 | 8/20/2015 | A | PASS |
Daryl Spivey
|
|
|
###-#### Is Gabe the project manager, please call him on your way to insure access. We have been accessing the project from the back door of the residence. Any issues please let me know. Thanks. Phone #: ###-#### Inspection requested via web by Josh Johnson
|
Plumbing Rough-in | 8/13/2015 | 8/14/2015 | 8/14/2015 | A | CANC |
Daryl Spivey
|
|
|
Please call Gabe at ###-#### for access. We have been using the side door entrance. If he can''t make it please let me know so I can get over there. Thanks. Phone #: ###-#### Inspection requested via web by Josh Johnson
|