Final | 10/19/2015 | 10/19/2015 | 10/19/2015 | P | PASS |
Jim Little
|
|
|
Phone #: ###-#### Inspection requested via web by steven smith
|
Plumbing Rough-in | 8/14/2015 | 8/14/2015 | 8/14/2015 | P | PASS |
Jim Little
|
|
|
corrections made.
|
Plumbing Rough-in | 8/13/2015 | 8/14/2015 | 8/14/2015 | A | FAIL |
Jim Little
|
|
|
please call when in route Phone #: ###-#### Inspection requested via web by steven smith >vent backgraded from wb to hub drain >trap arm in main bath is flat >bldg drain runs away from sewer tie in, check at final
|