Final | 8/9/2016 | 8/9/2016 | 8/9/2016 | P | PASS |
Eric Strole
|
|
|
|
Other | 8/9/2016 | 8/9/2016 | 8/9/2016 | P | DONE |
Eric Strole
|
|
|
1:00 PM Conferance
|
Other | 8/8/2016 | 8/9/2016 | 8/9/2016 | A | CANC |
Eric Strole
|
|
|
THIS IS FOR A CONSULT. ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER-Changed to PM
|
Final | 8/3/2016 | 8/4/2016 | 8/4/2016 | A | PART |
Jim Little
|
|
|
MATT IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER >all floors ok >need to check kitchen equip when it arrives >temp occ ok
|
Final | 7/21/2016 | 7/22/2016 | 7/22/2016 | P | PART |
Eric Strole
|
|
|
MATT IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER-This inspection was for 4th flr only.Need to turn water into all rooms and finish caulking all fixtures on 4th flr.
|
Plumbing Rough-in | 7/20/2016 | 7/20/2016 | 7/20/2016 | P | PART |
Eric Strole
|
|
|
JOB CONTACT - MATT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER-Conferance on backflow for ice maker. Not needed.
|
Other | 6/20/2016 | 6/21/2016 | 6/21/2016 | A | CANC |
Eric Strole
|
|
|
|
Plumbing Rough-in | 6/17/2016 | 6/20/2016 | 6/20/2016 | P | PASS |
Eric Strole
|
|
|
MATT IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER-OK to insulate piping in mech room.
|
Plumbing Rough-in | 5/11/2016 | 5/12/2016 | 5/12/2016 | A | PASS |
Eric Strole
|
|
|
MATT IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER
|
Plumbing Rough-in | 4/28/2016 | 4/29/2016 | 4/29/2016 | A | PART |
Eric Strole
|
|
|
MATT IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER-Recirc 4th flr corridor pass.
|
Plumbing Rough-in | 4/15/2016 | 4/18/2016 | 4/18/2016 | A | PART |
Eric Strole
|
|
|
MATT IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER-Water in laundry, break room, kitchen guest bath pass.
|
Plumbing Rough-in | 4/7/2016 | 4/8/2016 | 4/8/2016 | A | PART |
Eric Strole
|
|
|
MATT IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER-2nd and 3rd flr rough-in pass.
|
Plumbing Rough-in | 4/7/2016 | 4/7/2016 | 4/7/2016 | P | CANC |
Eric Strole
|
|
|
DAVID IS THE JOB CONTACT ###-#### Phone #: ###-#### >> Inspection requested via web by BECCA DUMMER Inspection cancelled from web by: BECCA DUMMER
|
Plumbing Rough-in | 4/6/2016 | 4/7/2016 | 4/7/2016 | A | PART |
Eric Strole
|
|
|
MATT IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER-Section of water pass.
|
Plumbing Rough-in | 4/1/2016 | 4/1/2016 | 4/1/2016 | P | PART |
Eric Strole
|
|
|
4th flr rough-in only pass.
|
Plumbing Rough-in | 3/31/2016 | 4/1/2016 | 4/1/2016 | P | CANC |
Eric Strole
|
|
|
|
Plumbing Rough-in | 3/31/2016 | 4/1/2016 | 4/1/2016 | A | PART |
Eric Strole
|
|
|
MATT IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER-All dwv complete.
|
Plumbing Rough-in | 3/30/2016 | 3/31/2016 | 3/31/2016 | P | PART |
Eric Strole
|
|
|
MATT IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER-Need to plumb toilet per 2009 ispc and fix leak on dwv.
|
Plumbing Rough-in | 3/29/2016 | 3/30/2016 | 3/30/2016 | P | PART |
Eric Strole
|
|
|
MATT IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER-units 100 thru 444 s/side 102 thru 410 n/side waste pass. Units 100 thru 434 s/side 102 thru 414 n/side water pass.
|
Plumbing Rough-in | 3/29/2016 | 3/30/2016 | 3/30/2016 | A | PART |
Eric Strole
|
|
|
MATT IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER-Section looked at test pass. Will get room numbers at afternoon inspection.
|
Roof Drains | 3/24/2016 | 3/25/2016 | 3/25/2016 | P | PART |
Eric Strole
|
|
|
Roofdrains complete except over front entryway.
|
Plumbing Rough-in | 3/24/2016 | 3/24/2016 | 3/24/2016 | P | PART |
Eric Strole
|
|
|
MATT IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER-Need to use mission bands from cast iron to pvc and need to nail plate. Test ok.
|
Plumbing Rough-in | 3/17/2016 | 3/17/2016 | 3/17/2016 | P | PART |
Eric Strole
|
|
|
MATT IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER-Units144,143,115,212,214'213,215,312,314,313,315,412,414,413 &415 r/i pass.
|
Plumbing Rough-in | 3/14/2016 | 3/15/2016 | 3/15/2016 | P | CANC |
Eric Strole
|
|
|
MATT IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER
|
Plumbing Rough-in | 3/14/2016 | 3/14/2016 | 3/14/2016 | P | PART |
Eric Strole
|
|
|
Units 101 thru 411 and roof drains in that area r/i pass.
|
Plumbing Rough-in | 3/10/2016 | 3/10/2016 | 3/10/2016 | P | PART |
Eric Strole
|
|
|
MATT IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER-Units 105 thru 405,106 thru 407,109 thru 409,206 thru 406,208 thru 408,210 thru 410 r/i pass. Water test in units 110 thru 411 pass.
|
Plumbing Rough-in | 2/29/2016 | 2/29/2016 | 2/29/2016 | P | CANC |
Eric Strole
|
|
|
MATT IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER
|
Plumbing Rough-in | 2/29/2016 | 2/29/2016 | 2/29/2016 | A | PART |
Eric Strole
|
|
|
1st flr corridor waterlines in overhead ok to cover.
|
Plumbing Rough-in | 2/25/2016 | 2/26/2016 | 2/29/2016 | P | CANC |
Eric Strole
|
|
|
MATT IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER
|
Plumbing Rough-in | 2/25/2016 | 2/26/2016 | 2/26/2016 | A | CANC |
Eric Strole
|
|
|
MATT IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMME
|
Plumbing Rough-in | 2/23/2016 | 2/24/2016 | 2/24/2016 | A | PART |
Eric Strole
|
|
|
Units 100 thru 401, 102 thru 402,103 thru 403, 104 thru 404 dwv test pass. Units 100 thru 401, 103 thru 403, 102 thru 402 water test pass.
|
Plumbing Rough-in | 2/22/2016 | 2/23/2016 | 2/23/2016 | P | PASS |
Eric Strole
|
|
|
MATT IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER-Walk-thru dwv and water
|
Plumbing Rough-in | 2/22/2016 | 2/23/2016 | 2/23/2016 | A | DONE |
Eric Strole
|
|
|
MATT IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER-Walk-thru dwv and water
|
Groundwork | 10/13/2015 | 10/14/2015 | 10/14/2015 | P | PASS |
Daryl Spivey
|
|
|
MATT IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER ground work complete...ds
|
Groundwork | 10/9/2015 | 10/12/2015 | 10/12/2015 | A | PART |
Eric Strole
|
|
|
Section complete is marked on plans
|
Groundwork | 10/8/2015 | 10/9/2015 | 10/9/2015 | P | CANC |
Eric Strole
|
|
|
|
Groundwork | 10/8/2015 | 10/8/2015 | 10/8/2015 | P | PART |
Eric Strole
|
|
|
MATT IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER-section complete is marked on plans
|
Groundwork | 10/5/2015 | 10/6/2015 | 10/6/2015 | A | PART |
Eric Strole
|
|
|
MATT IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER-Section complete is marked on plans. Water service pass.
|
Groundwork | 9/30/2015 | 10/1/2015 | 10/1/2015 | A | PART |
Eric Strole
|
|
|
MATT IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER-Section complete is marked on plans.
|
Water and/or Sewer | 9/23/2015 | 9/23/2015 | 9/23/2015 | P | PART |
Bill VanDegrift
|
|
|
MATT IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER water to dumpster ok to cover
|
Water and/or Sewer | 9/22/2015 | 9/23/2015 | 9/23/2015 | A | CANC |
Bill VanDegrift
|
|
|
MATT IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER water line to dumpster area is being relaid to depth and moving to inside if building wall insulation.
|