Final | 4/10/2016 | 4/11/2016 | 4/11/2016 | A | PASS |
Daryl Spivey
|
|
|
Daryl i will have the last bit ready for you at 9. Hope your feeling better. Phone #: ###-#### Inspection requested via web by Brian Watson
|
Water and/or Sewer | 4/10/2016 | 4/11/2016 | 4/10/2016 | A | CANC |
Daryl Spivey
|
|
|
Daryl i will have this ready at 9. Hope your feeling better. Thanks. Phone #: ###-#### >> Inspection requested via web by Brian Watson Inspection cancelled from web by: Brian Watson
|
Final | 4/7/2016 | 4/8/2016 | 4/8/2016 | P | PART |
Jim Little
|
|
|
Daryl, i will have this ready for you at 3. Hopefully that works. Thanks Phone #: ###-#### Inspection requested via web by Brian Watson >need tempering valves on public use lavs in hall >finish break sink >temp occ ok
|
Final | 4/6/2016 | 4/7/2016 | 4/7/2016 | P | PART |
Bill VanDegrift
|
|
|
Daryl i will have the second floor for you to look at. First floor on friday. I will have 2 nd ready for you at 2 thanks. Phone #: ###-#### Inspection requested via web by Brian Watson second floor final ok
|
Other | 3/3/2016 | 3/3/2016 | 3/3/2016 | P | PART |
Bill VanDegrift
|
|
|
1:30 ###-#### floor drains boxed out of the return air plenum ok
|
Plumbing Rough-in | 2/4/2016 | 2/4/2016 | 2/4/2016 | A | PASS |
Daryl Spivey
|
|
|
Daryl i will have this ready for you at 9 if that works. Thanks. Phone #: ###-#### Inspection requested via web by Brian Watson R/I complete.........ds
|
Plumbing Rough-in | 1/12/2016 | 1/13/2016 | 1/13/2016 | P | PASS |
Daryl Spivey
|
|
|
Daryl. I will have this ready for you at 3. Hope that works. Thanks Phone #: ###-#### Inspection requested via web by Brian Watson rough in complete.........ds
|
Plumbing Rough-in | 12/14/2015 | 12/15/2015 | 12/15/2015 | P | PART |
Daryl Spivey
|
|
|
Daryl i will have this ready for you at 330-4:00. Hopefully that works. Call me if not. Thanks Phone #: ###-#### Inspection requested via web by Brian Watson phase 2 roughed in.....ok for cover......ds
|
Plumbing Rough-in | 11/23/2015 | 11/24/2015 | 11/24/2015 | P | PART |
Daryl Spivey
|
|
|
Daryl I will have this ready for you at 3. Hopefully that works. Thanks. Phone #: ###-#### Inspection requested via web by Brian Watsoni 8 rooms tested ok 1st phase 4 dn 4 up
|
Groundwork | 9/16/2015 | 9/17/2015 | 9/17/2015 | A | PASS |
Daryl Spivey
|
|
|
Daryl I will have this ready for you at 9. Thanks Phone #: ###-#### Inspection requested via web by Brian Watson ground work done........ds
|
Groundwork | 9/10/2015 | 9/10/2015 | 9/10/2015 | A | PART |
Daryl Spivey
|
|
|
Daryl I will have this ready at 10. Thanks Phone #: ###-#### Inspection requested via web by Brian Watson
|
Water and/or Sewer | 9/9/2015 | 9/9/2015 | 9/9/2015 | A | PART |
Daryl Spivey
|
|
|
Daryl I should have this ready around 11 for you. Thanks Phone #: ###-#### Inspection requested via web by Brian Watson water service ok...........ds
|
Groundwork | 9/2/2015 | 9/3/2015 | 9/3/2015 | A | PART |
Daryl Spivey
|
|
|
Daryl I will have this ready for you at 10 Thank you so much Phone #: ###-#### Inspection requested via web by Brian Watson trunk line east side out to buildind drain..ds
|
Groundwork | 8/29/2015 | 8/31/2015 | 8/31/2015 | A | PART |
Eric Strole
|
|
|
Daryl I will have this ready at 9 AM Phone #: ###-#### Inspection requested via web by Brian Watson-West section pass. Section marked on plans.
|