PLM-Aging Inspection | 11/2/2016 | 11/2/2016 | 11/2/2016 | | PASS |
Eric Strole
|
|
|
|
DOC - Permit Finaled | 11/2/2016 | 11/2/2016 | 11/2/2016 | A | PASS |
Eric Strole
|
|
|
|
PLM-Aging Inspection | 8/3/2016 | 8/3/2016 | 8/3/2016 | | PART |
Eric Strole
|
|
|
|
PLM-Aging Inspection | 5/4/2016 | 5/4/2016 | 5/4/2016 | | CANC |
Eric Strole
|
|
|
|
PLM-Aging Inspection | 2/3/2016 | 2/3/2016 | 2/3/2016 | | PEND |
Bill VanDegrift
|
|
|
|
Plumbing Rough-in | 11/4/2015 | 11/5/2015 | 11/5/2015 | A | PASS |
Eric Strole
|
|
|
Sewer line air test, requests 11AM - James Phone #: ###-####-Test on sewer pass.
|
Roof Drains | 10/12/2015 | 10/13/2015 | 10/13/2015 | A | PASS |
Bill VanDegrift
|
|
|
exterior rain drains ok
|
Roof Drains | 10/12/2015 | 10/12/2015 | 10/12/2015 | P | FAIL |
Eric Strole
|
|
|
Need to uncover or camera storm drain. Test ok.
|
Water and/or Sewer | 10/1/2015 | 10/12/2015 | 10/12/2015 | A | CANC |
Eric Strole
|
|
|
|
Water and/or Sewer | 9/30/2015 | 10/1/2015 | 10/1/2015 | A | FAIL |
Eric Strole
|
|
|
Left correction notice to uncover sewer for inspection & and show 1 1/2% through out & have 10 days to comply.
|
Other | 9/28/2015 | 9/28/2015 | 9/29/2015 | P | CANC |
Eric Strole
|
|
|
|
Water and/or Sewer | 9/23/2015 | 9/23/2015 | 9/23/2015 | P | FAIL |
Bill VanDegrift
|
|
|
-approved plans show sewer service at 2% - sewer installed at 1% -provide engineering showing code compliance, fixture loading ,etc.
|
Water and/or Sewer | 9/22/2015 | 9/22/2015 | 9/22/2015 | P | PART |
Jim Little
|
|
|
Colby Phone #: ###-#### >6" sewer from stub at street to first c/o by end of bldg, visual ok to bury, air test to be after backfill.
|