Water and/or Sewer | 4/5/2016 | 4/6/2016 | 4/6/2016 | A | PASS |
Bill VanDegrift
|
|
|
Phone #: ###-#### Inspection requested via web by Doug Bowles
|
Sprinkler (Final) | 4/6/2016 | 4/6/2016 | 4/6/2016 | P | PASS |
Bill VanDegrift
|
|
|
Phone #: ###-#### Inspection requested via web by Doug Bowles
|
PLM-Aging Inspection | 2/2/2016 | 2/2/2016 | 2/2/2016 | | PART |
Jim Little
|
|
|
wip
|
Other | 10/8/2015 | 10/9/2015 | 10/9/2015 | A | PASS |
Bill VanDegrift
|
|
|
Sprinkler Tie in w/ pressure testing Phone #: ###-#### Inspection requested via web by Doug Bowles tie in and valves ok
|
Other | 10/6/2015 | 10/7/2015 | 10/7/2015 | A | FAIL |
Jim Little
|
|
|
Please Inspect Sprinkler Tie-in so it can be buried before framing begins. Backflow to be done when all 4 sites have live water. Thank you! Phone #: ###-#### Inspection requested via web by Doug Bowles >need 50 psi air test to make sure connections do not leak before bury.
|