Final | 3/7/2016 | 3/7/2016 | 3/7/2016 | P | PASS |
Jim Little
|
|
|
Inspection requested via web by Erin Whiting
|
Plumbing Rough-in | 1/11/2016 | 1/11/2016 | 1/11/2016 | P | PASS |
Jim Little
|
|
|
please come at 12:00 Thanks Inspection requested via web by Erin Whiting
|
Plumbing Rough-in | 1/8/2016 | 1/8/2016 | 1/8/2016 | P | FAIL |
Jim Little
|
|
|
Please come at 12:00 Inspection requested via web by Erin Whiting >tub vents need to be 6" above flood level rim before turning horizontal. >fix bowed vent from kitchen sink on overhead.
|
Groundwork | 10/22/2015 | 10/22/2015 | 10/22/2015 | P | PASS |
Jim Little
|
|
|
Inspection requested via web by Erin Whiting
|