Final | 12/9/2015 | 12/10/2015 | 12/10/2015 | P | PASS |
Daryl Spivey
|
|
|
Phone #: ###-#### Inspection requested via web by Soubanh Senethavialy
|
Plumbing Rough-in | 11/8/2015 | 11/9/2015 | 11/9/2015 | A | PASS |
Daryl Spivey
|
|
|
Phone #: ###-#### Inspection requested via web by Soubanh Senethavialy
|
Groundwork | 10/8/2015 | 10/9/2015 | 10/9/2015 | P | PASS |
Daryl Spivey
|
|
|
Tie in water from house to garage to feed one water heater, one toilet and one sink. Tie in sewer, clean out outside garage and 3 in line to catch 1 toilet and one sink upstairs. Phone #: ###-#### Inspection requested via web by Soubanh Senethavialy
|