Final | 5/24/2016 | 5/24/2016 | 5/24/2016 | P | PASS |
Jim Little
|
|
|
BRIAN IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER
|
Final | 5/18/2016 | 5/20/2016 | 5/20/2016 | A | PART |
Jim Little
|
|
|
JOB CONTACT - DAVID ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER >mac faucets need asse 1070 tempering valves installed >install HBVB on misc boiler drains >install bigger expansion tank on 120 gal water heater. >temp occ ok
|
Plumbing Rough-in | 4/11/2016 | 4/12/2016 | 4/12/2016 | A | PASS |
Jim Little
|
|
|
DAVID IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER >carwash ri ok
|
Plumbing Rough-in | 4/7/2016 | 4/8/2016 | 4/8/2016 | A | CANC |
Jim Little
|
|
|
DAVID IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER
|
Water and/or Sewer | 4/7/2016 | 4/7/2016 | 4/7/2016 | P | PASS |
Jim Little
|
|
|
>carwash rd's ok >vents to incp tanks ok
|
Plumbing Rough-in | 4/5/2016 | 4/6/2016 | 4/6/2016 | P | PART |
Eric Strole
|
|
|
DAVID IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER-Detail and express lube including roof drains rough-in pass.
|
Plumbing Rough-in | 4/1/2016 | 4/1/2016 | 4/1/2016 | P | PART |
Jim Little
|
|
|
>moved from am >service bathooms ok >non potable ok
|
Plumbing Rough-in | 3/31/2016 | 4/1/2016 | 4/1/2016 | A | CANC |
Jim Little
|
|
|
DAVID IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER >moved to pm, plumber was going to lunch.
|
Plumbing Rough-in | 3/25/2016 | 3/28/2016 | 3/28/2016 | A | PASS |
Jim Little
|
|
|
DAVID IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER >main bathrooms ri ok
|
Plumbing Rough-in | 3/21/2016 | 3/21/2016 | 3/21/2016 | P | PART |
Daryl Spivey
|
|
|
DAVID IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER partial on water in overhead, d/f and hosebib tested ok...........ds
|
Plumbing Rough-in | 3/17/2016 | 3/18/2016 | 3/18/2016 | A | PART |
Jim Little
|
|
|
DAVID IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER >south canopy rd ok >vent at sw corner ok >3/4 copper sw corner ok
|
Plumbing Rough-in | 3/14/2016 | 3/15/2016 | 3/15/2016 | P | PART |
Jim Little
|
|
|
DAVID IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER >manager bath ri ok >RD's s.e. corner ok marked plans
|
Groundwork | 1/26/2016 | 1/27/2016 | 1/27/2016 | A | PASS |
Bill VanDegrift
|
|
|
DAVID IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER stug grease line outside of the building ok, last of the gw.
|
Groundwork | 1/20/2016 | 1/21/2016 | 1/21/2016 | P | PART |
Jim Little
|
|
|
DAVID IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER >td,s ok
|
Groundwork | 1/14/2016 | 1/14/2016 | 1/14/2016 | P | PASS |
Jim Little
|
|
|
DAVID IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER >car wash trench drain ok
|
Groundwork | 1/4/2016 | 1/4/2016 | 1/4/2016 | P | PART |
Jim Little
|
|
|
DAVID IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER >sewer trunk line from restrooms to 5' outside ok.
|
Groundwork | 12/30/2015 | 12/31/2015 | 12/31/2015 | P | CANC |
Jim Little
|
|
|
DAVID IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER >canceled via text from David
|
Groundwork | 12/23/2015 | 12/23/2015 | 12/23/2015 | P | PASS |
Jim Little
|
|
|
DAVID IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER >eye wash gw ok
|
Groundwork | 12/21/2015 | 12/21/2015 | 12/21/2015 | P | CANC |
Jim Little
|
|
|
DAVID IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER >canceled via text msg. from David.
|
Groundwork | 12/15/2015 | 12/16/2015 | 12/16/2015 | A | PASS |
Jim Little
|
|
|
DAVID IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER >2 1/2" water main into bldg ok
|
Groundwork | 12/9/2015 | 12/9/2015 | 12/9/2015 | P | PASS |
Jim Little
|
|
|
DAVID IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER >service tech bathroom gw ok
|
Groundwork | 12/7/2015 | 12/7/2015 | 12/7/2015 | P | PART |
Jim Little
|
|
|
DAVID IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER > grease gw ok to cover in detail shop >grease gw ok to cover on east side of service bays
|
Groundwork | 12/2/2015 | 12/3/2015 | 12/3/2015 | P | CANC |
Jim Little
|
|
|
DAVID IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER >canceled via text from David.
|
Groundwork | 11/24/2015 | 11/25/2015 | 11/25/2015 | P | PASS |
Jim Little
|
|
|
DAVID IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER >3 trench drains ok
|
Plumbing Rough-in | 11/13/2015 | 11/13/2015 | 11/13/2015 | P | PART |
Jim Little
|
|
|
rescheduled from am, David wanted a pm inspection. >bathroom gw ok
|
Groundwork | 11/12/2015 | 11/13/2015 | 11/13/2015 | A | CANC |
Jim Little
|
|
|
DAVID IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER >David called and wanted a pm inspection.
|
Groundwork | 11/6/2015 | 11/6/2015 | 11/6/2015 | P | PART |
Jim Little
|
|
|
DAVID IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER >managers bath ok and trunk line >visual ok on grease line @ FD, pressure test later
|