Sprinkler (Final) | 11/10/2015 | 11/12/2015 | 11/12/2015 | A | PASS |
Jim Little
|
|
|
backflow tie in is ready to finalize....I PROMISE - please contact Thad if you have any questions or issues - so appreicate your patience. Thank you. Phone #: ###-#### Inspection requested via web by Kerri Collins >ok once upper drain valve upstream of rp is removed, work in progress bby contractor.
|
Sprinkler (Final) | 11/6/2015 | 11/9/2015 | 11/6/2015 | A | CANC |
Jim Little
|
|
|
The lock has been removed from the meter ready to inspect - sorry for any inconvenience this has caused for you.
If you have any questions or issues, please do not hesitate to contact Lavon at the number above. Thank you. Phone #: ###-#### >> Inspection requested via web by Kerri Collins Inspection cancelled from web by: Kerri Collins
|
Sprinkler (Final) | 10/30/2015 | 11/3/2015 | 11/2/2015 | A | CANC |
Jim Little
|
|
|
Please call Benny at the above number if you have any questions.
Thank you Phone #: ###-#### Inspection requested via web by Kerri Collins >not ready via phone call from general
|