Final | 1/25/2016 | 1/26/2016 | 1/26/2016 | A | PASS |
Jim Little
|
|
|
Phone #: ###-#### Inspection requested via web by Raul Castanon
|
Other | 11/4/2015 | 11/4/2015 | 11/4/2015 | P | PASS |
Jim Little
|
|
|
Pressure test on relocated gas main Phone #: ###-#### Inspection requested via web by Raul Castanon >20# gas test ok
|
Plumbing Rough-in | 11/3/2015 | 11/3/2015 | 11/3/2015 | A | PASS |
Jim Little
|
|
|
shower valve and sink, pressure test later Phone #: ###-#### Inspection requested via web by Raul Castanon >ok once nail plated at kitchen rough in
|
Water and/or Sewer | 11/2/2015 | 11/3/2015 | 11/3/2015 | A | CANC |
Jim Little
|
|
|
shower valve and sink, pressure test later Phone #: ###-#### Inspection requested via web by Raul Castanon
|