Final | 2/24/2016 | 2/25/2016 | 2/25/2016 | A | PASS |
Bill VanDegrift
|
|
|
Site manager, Paul Thompson, ###-####, must call for access. He''s usually on site at the project trailer. Phone #: ###-#### Inspection requested via web by Chris Field final ok with air gap at t&p
|
Plumbing Rough-in | 12/18/2015 | 12/18/2015 | 12/18/2015 | P | PASS |
Bill VanDegrift
|
|
|
WE STRAPPED THE PLACES PER INSPECTOR REQUEST. Phone #: ###-#### Inspection requested via web by Chris Field
|
Plumbing Rough-in | 12/17/2015 | 12/17/2015 | 12/17/2015 | P | PART |
Jim Little
|
|
|
ROUGH IN REINSPECT Phone #: ###-#### Inspection requested via web by Chris Field >still need a couple straps in crawl on abs at end of runs. >ok to pull test and cover
|
Plumbing Rough-in | 12/9/2015 | 12/10/2015 | 12/10/2015 | A | FAIL |
Jim Little
|
|
|
PAUL THOMPSON, SITE MANAGER Phone #: ###-#### Inspection requested via web by Chris Field 1>roll vent on upstairs tub. 2>hang abs every 4' in crawl to end of run. 3>need cleanout at base of stack. 4>tub vented wrong on main level. 5>use a shielded coupling at sewer connection, transition glue not approved for inside the building for pvc to abs. >6 relocate Hose bibb. not allowed on exterior wall.
|