Permit Information
Permit NumberPLM15-04143
StatusFinaled
Name G & S EXCAVATION LLC
Site Address 2153 E RIVERWALK DR
Project Name 
Customer Number 
ePlanReviewNo
Description
New: Sewer - Connect to existing stub, Install 333 LF of 6" sewer line, 51 LF of 4" sewer line, (5) clean outs
Water - Connect to existing water meter, Install 280 LF of 2.5" water line
Storm - Install swales as per plans, 51 LF of 4" storm line, 408 LF of 6
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
PLM-Aging Inspection12/23/201612/23/201612/23/2016 PASS
DetailsEric Strole
DOC - Permit Finaled12/23/201612/23/201612/23/2016APASS
DetailsEric Strole
PLM-Aging Inspection9/23/20169/23/20169/23/2016 CANC
DetailsEric Strole
PLM-Aging Inspection6/24/20166/24/20166/24/2016 CANC
DetailsEric Strole
Water and/or Sewer3/25/20163/28/20163/28/2016APASS
DetailsEric Strole
Water Line; Isaac Phone #: ###-####-Test on water main pass.
Water and/or Sewer2/16/20162/16/20162/16/2016PPART
DetailsEric Strole
Visual on sewer line - Isaac Phone #: ###-####-Test on sewer pass
Water and/or Sewer2/11/20162/12/20162/12/2016AFAIL
DetailsEric Strole
Isaac// prefers 8am Phone #: ###-####-Test on sewer fail
Water and/or Sewer2/11/20162/11/20162/11/2016ACANC
DetailsEric Strole
Water and/or Sewer2/4/20162/9/20162/9/2016ANR
DetailsEric Strole
9:30 AM Test
Water and/or Sewer1/21/20161/22/20161/22/2016APART
DetailsEric Strole
Water Line ONLY; Isaac Phone #: ###-####-Waterline ok to cover. Still need tested.
Water and/or Sewer1/19/20161/19/20161/19/2016APART
DetailsEric Strole
270' of water service installed. Need meter and flange to building hooked up and tested.
Water and/or Sewer1/14/20161/15/20161/15/2016PPART
DetailsEric Strole
water line - Issac Phone #: ###-####-Need to tie-into meter and have another 30' of 2 1/2 ' water servce to run. Need to test.
Water and/or Sewer1/11/20161/11/20161/11/2016PPART
DetailsEric Strole
295' installed
Water and/or Sewer1/11/20161/11/20161/11/2016APART
DetailsEric Strole
1st 210' up to 2nd c/o installed.
Water and/or Sewer1/7/20161/8/20161/8/2016PPART
DetailsEric Strole
200' installed
Water and/or Sewer1/7/20161/8/20161/8/2016APART
DetailsEric Strole
116' installed
Water and/or Sewer1/6/20161/7/20161/7/2016PPART
DetailsEric Strole
78' up to 1st cleanout installed.
Water and/or Sewer1/6/20161/7/20161/7/2016APART
DetailsEric Strole
1st 45' of sewer from manhole to building installed. Will test and camera when complete.
Water and/or Sewer1/6/20161/6/20161/6/2016PNR
DetailsEric Strole
Not ready
Water and/or Sewer1/4/20161/4/20161/4/2016PDONE
DetailsEric Strole
This was a conferance on sewer and storm drains.