Final | 8/9/2016 | 8/9/2016 | 8/10/2016 | P | PASS |
Jim Little
|
|
|
Jim Phone #: ###-####
|
PLM-Aging Inspection | 5/30/2016 | 5/30/2016 | 5/31/2016 | | PART |
Eric Strole
|
|
|
No calls
|
Plumbing Rough-in | 2/26/2016 | 2/26/2016 | 2/26/2016 | P | PASS |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by James Paulin
|
Water and/or Sewer | 2/12/2016 | 2/12/2016 | 2/12/2016 | P | PASS |
Bill VanDegrift
|
|
|
Will be ready after noon. Phone #: ###-#### Inspection requested via web by James Paulin sw to shop ok to cover
|
Groundwork | 12/3/2015 | 12/4/2015 | 12/4/2015 | A | PASS |
Eric Strole
|
|
|
Request inspection before 10 A.M. so to finish prep for afternoon concrete pour. Phone #: ###-#### Inspection requested via web by James Paulin
|