Final | 5/4/2016 | 5/5/2016 | 5/5/2016 | A | PASS |
Eric Strole
|
|
|
First thing in the morning if possible. Hard wood is scheduled for finish later in the morning. Phone #: ###-#### Inspection requested via web by Janene/ Dan
|
Plumbing Rough-in | 4/14/2016 | 4/15/2016 | 4/15/2016 | P | PASS |
Eric Strole
|
|
|
Second half of the rough-in inspection. The addition is open. Phone #: ###-#### Inspection requested via web by Janene/ Dan
|
Plumbing Rough-in | 1/12/2016 | 1/12/2016 | 1/12/2016 | P | PASS |
Eric Strole
|
|
|
|
Plumbing Rough-in | 1/11/2016 | 1/12/2016 | 1/12/2016 | A | FAIL |
Eric Strole
|
|
|
Call for access instructions. Phone #: ###-#### Inspection requested via web by Janene/ Dan-DWV and water test fail.
|