Final | 3/17/2016 | 3/17/2016 | 3/17/2016 | A | PASS |
Eric Strole
|
|
|
Call Greg for access Phone #: ###-#### Inspection requested via web by Brandon Rohricht
|
Final | 3/9/2016 | 3/10/2016 | 3/10/2016 | A | PART |
Eric Strole
|
|
|
8am please Phone #: ###-#### Inspection requested via web by Brandon Rohricht-Need to install all equipment and have all backflows tested. Temp final ok.
|
Plumbing Rough-in | 2/17/2016 | 2/17/2016 | 2/17/2016 | A | PASS |
Eric Strole
|
|
|
Call Greg for access Moving hand sink water in the wall Phone #: ###-#### Inspection requested via web by Brandon Rohricht
|
Other | 1/29/2016 | 1/30/2016 | 1/30/2016 | A | PART |
Eric Strole
|
|
|
gas pressure test-60 lb gas test pass. No other plumbing inspections will be done till plans are resubmited and approved.
|
Plumbing Rough-in | 1/19/2016 | 1/19/2016 | 1/19/2016 | A | PASS |
Eric Strole
|
|
|
Plumbing rough-in pass.
|
Water and/or Sewer | 1/19/2016 | 1/19/2016 | 1/19/2016 | A | CANC |
Eric Strole
|
|
|
|
Plumbing Rough-in | 1/18/2016 | 1/19/2016 | 1/19/2016 | A | CANC |
Eric Strole
|
|
|
Later morning ; gas pressure test Phone #: ###-#### Inspection requested via web by Brandon Rohricht
|
Groundwork | 1/14/2016 | 1/15/2016 | 1/15/2016 | P | PASS |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Brandon Rohricht
|