Final | 7/21/2016 | 7/21/2016 | 7/21/2016 | P | PASS |
Daryl Spivey
|
|
|
|
Final | 6/9/2016 | 6/9/2016 | 6/9/2016 | A | PART |
Daryl Spivey
|
|
|
Inspection requested via web by Bob Bennett occ. ok.........needs permit for back house and spklr permit, t&p ran also.........ds
|
Water and/or Sewer | 4/20/2016 | 4/20/2016 | 4/20/2016 | P | PART |
Daryl Spivey
|
|
|
needs an approved back flow on sprinkler installed........ds
|
Water and/or Sewer | 4/20/2016 | 4/20/2016 | 4/20/2016 | P | NR |
Daryl Spivey
|
|
|
Phone #: ###-#### Inspection requested via web by Bob Bennett
|
Plumbing Rough-in | 3/14/2016 | 3/14/2016 | 3/14/2016 | A | PASS |
Bill VanDegrift
|
|
|
Phone #: ###-#### Inspection requested via web by Bob Bennett this rough in was for the main house still needs a permit for the ADU
|
Plumbing Rough-in | 3/11/2016 | 3/11/2016 | 3/11/2016 | P | PASS |
Jim Little
|
|
|
Phone #: ###-#### Inspection requested via web by Bob Bennett >ri ok for back unit upper which is 614 walnut and will be re permitted and lower ri ok which is 610, confused yet.
|
Groundwork | 2/24/2016 | 2/24/2016 | 2/24/2016 | P | PART |
Bill VanDegrift
|
|
|
Bob Phone #: ###-#### gw in ADU ok, needs to update permitting, needs additional permit for ADU
|
Final | 2/9/2016 | 2/10/2016 | 2/10/2016 | A | PASS |
Daryl Spivey
|
|
|
Phil Phone #: ###-####
|
Final | 2/5/2016 | 2/8/2016 | 2/8/2016 | A | PART |
Daryl Spivey
|
|
|
Phil Phone #: ###-#### tested ok...need to pay fees..........ds
|
Water and/or Sewer | 2/3/2016 | 2/3/2016 | 2/3/2016 | P | PASS |
Daryl Spivey
|
|
|
sewer line ONLY; Phil Phone #: ###-####
|
Water and/or Sewer | 1/25/2016 | 1/25/2016 | 1/25/2016 | P | PART |
Daryl Spivey
|
|
|
Phone #: ###-#### Inspection requested via web by Bob Bennett partial sewer line............ds
|