Final | 5/9/2016 | 5/10/2016 | 5/10/2016 | A | PASS |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Tobi Wilson
|
Other | 5/4/2016 | 5/5/2016 | 5/5/2016 | P | PART |
Eric Strole
|
|
|
Walkthru-This was a conferance on backflows required. Need a rpba on pressure washer, Need a dbca on ice and tea maker.
|
Other | 5/3/2016 | 5/4/2016 | 5/4/2016 | A | DONE |
Eric Strole
|
|
|
PLUMBING CONFERENCE Phone #: ###-#### Inspection requested via web by Tobi Wilson-Partial walkthru
|
Plumbing Rough-in | 3/22/2016 | 3/24/2016 | 3/24/2016 | A | PASS |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Tobi Wilson
|
Groundwork | 2/18/2016 | 2/18/2016 | 2/18/2016 | P | PASS |
Bill VanDegrift
|
|
|
raindrain connections
|
Groundwork | 2/17/2016 | 2/18/2016 | 2/18/2016 | A | NR |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Tobi Wilson
|
Water and/or Sewer | 2/11/2016 | 2/12/2016 | 2/12/2016 | P | PASS |
Jim Little
|
|
|
Incp vent ok
|
Other | 2/11/2016 | 2/11/2016 | 2/11/2016 | P | PART |
Eric Strole
|
|
|
Consulting inspection Phone #: ###-#### Inspection requested via web by Tobi Wilson-Inlet piping to interceptor test pass.
|