Final | 1/8/2017 | 1/10/2017 | 1/10/2017 | A | PASS |
Daryl Spivey
|
|
|
Finished with trim to include basement bathroom. Phone #: ###-#### Inspection requested via web by Scott Sparrell
|
Final | 10/14/2016 | 10/14/2016 | 10/14/2016 | P | PART |
Daryl Spivey
|
|
|
Partial final. Have trim completed with exception of basement toilet, lavatory and kitchen due to tile. Occupancy requested by owner. Phone #: ###-#### Inspection requested via web by Scott Sparrell
|
PLM-Aging Inspection | 7/26/2016 | 7/26/2016 | 7/26/2016 | | PEND |
Daryl Spivey
|
|
|
wip
|
Plumbing Rough-in | 2/25/2016 | 2/26/2016 | 2/26/2016 | P | PASS |
Eric Strole
|
|
|
Reinspection of gas line with proper gas gauge. Phone #: ###-#### Inspection requested via web by Scott Sparrell-20 lb gas test pass
|
Plumbing Rough-in | 2/25/2016 | 2/25/2016 | 2/25/2016 | A | PASS |
Eric Strole
|
|
|
Master bathroom and kitchen remodel under test. Phone #: ###-#### Inspection requested via web by Scott Sparrell-rough-in pass, still need gas test.
|