Final | 3/16/2016 | 3/17/2016 | 3/17/2016 | P | PASS |
Jim Little
|
|
|
Phone #: ###-#### Inspection requested via web by Julie Dobransky >sketch of plumbing was emailed to Bill, per Bill. >correction made on cleanout
|
Plumbing Rough-in | 3/16/2016 | 3/16/2016 | 3/16/2016 | P | FAIL |
Jim Little
|
|
|
Phone #: ###-#### Inspection requested via web by Julie Dobransky >plans need to be submitted showing the piping for the bathroom, as discussed at time of gw and noted. >3" floor cleanout needs to be flush to prevent trip hazard
|
Groundwork | 2/16/2016 | 2/17/2016 | 2/17/2016 | A | PASS |
Jim Little
|
|
|
Phone #: ###-#### Inspection requested via web by Julie Dobransky >bath gw ok >Brad the owner of building will submit plumbing plans and pay additional sewer fees, check before final.
|
Groundwork | 2/15/2016 | 2/16/2016 | 2/16/2016 | P | PART |
Jim Little
|
|
|
Phone #: ###-#### Inspection requested via web by Julie Dobransky >TD ok
|