Final | 5/11/2016 | 5/12/2016 | 5/12/2016 | A | PASS |
Jim Little
|
|
|
end of the line cleanout is on the backside in the office. If questions contact Chad @ ###-####. Phone #: ###-#### Inspection requested via web by Stacia Haumann
|
Final | 5/10/2016 | 5/10/2016 | 5/10/2016 | P | FAIL |
Jim Little
|
|
|
if questions call Chad @ ###-#### Phone #: ###-#### Inspection requested via web by Stacia Haumann >608.5 ISPC—Relief valve drain piping shall not be smaller than the relief valve outlet, material used shall not reduce the internal bore of the pipe. Flex connector is not an approved material for T&P piping. >608.5 ISPC T&P shall not be trapped. >413.1 ISPC Hot water delivered from public use lavatories shall be limited to a maximum temperature of 120 degrees F by a device that conforms to ASSE 1070. > locate end of the line cleanout.
|
Plumbing Rough-in | 2/25/2016 | 2/26/2016 | 2/26/2016 | A | PASS |
Jim Little
|
|
|
RI waste/water if questions call Steve @ ###-#### Phone #: ###-#### Inspection requested via web by Stacia Haumann
|
Groundwork | 2/17/2016 | 2/17/2016 | 2/17/2016 | P | PASS |
Jim Little
|
|
|
if questions call Chad @ ###-#### Phone #: ###-#### Inspection requested via web by Stacia Haumann >gw ok
|