Final | 3/2/2016 | 3/2/2016 | 3/2/2016 | P | PASS |
Jim Little
|
|
|
Kitchen trim completed. Contractor on site Phone #: ###-#### Inspection requested via web by Scott Sparrell
|
Plumbing Rough-in | 2/24/2016 | 2/25/2016 | 2/25/2016 | A | PASS |
Bill VanDegrift
|
|
|
Clean out has been added on foot vent. Thanks. Phone #: ###-#### Inspection requested via web by Scott Sparrell ri ok
|
Plumbing Rough-in | 2/23/2016 | 2/23/2016 | 2/23/2016 | P | FAIL |
Jim Little
|
|
|
Island sink rough in plumbing. It''s under test. Contractor will be on site after 12pm. Phone #: ###-#### Inspection requested via web by Scott Sparrell >need a cleanout in the vertical portin of foot vent. (above the floor.)
|
Plumbing Rough-in | 2/22/2016 | 2/23/2016 | 2/23/2016 | A | CANC |
Jim Little
|
|
|
Chirs the contractor will be on site for access. Kitchen line is under test and water is on. Phone #: ###-#### >> Inspection requested via web by Scott Sparrell Inspection cancelled from web by: Scott Sparrell
|