Final | 6/7/2016 | 6/7/2016 | 6/7/2016 | P | PASS |
Eric Strole
|
|
|
Malloya Phone #: ###-####
|
Other | 6/6/2016 | 6/6/2016 | 6/6/2016 | P | DONE |
Eric Strole
|
|
|
conference; Malloya Phone #: ###-####
|
Other | 6/1/2016 | 6/2/2016 | 6/2/2016 | P | DONE |
Eric Strole
|
|
|
Conferance again on tie-in.
|
Other | 5/31/2016 | 6/1/2016 | 6/1/2016 | A | PART |
Eric Strole
|
|
|
Malloya// please call before Phone #: ###-####-Conferance on tieing in waste line.
|
Plumbing Rough-in | 3/15/2016 | 3/15/2016 | 3/15/2016 | P | PASS |
Eric Strole
|
|
|
Malloya Phone #: ###-####
|
Plumbing Rough-in | 3/11/2016 | 3/14/2016 | 3/14/2016 | A | FAIL |
Eric Strole
|
|
|
Please call ahead to meet - Malloya Phone #: ###-####-DWV test fail, need to support dwv every 4' and need to finish and test water.
|
Plumbing Rough-in | 3/10/2016 | 3/11/2016 | 3/11/2016 | A | DONE |
Eric Strole
|
|
|
9:00 AM-Conferance on DWV
|
Plumbing Rough-in | 3/9/2016 | 3/10/2016 | 3/10/2016 | A | FAIL |
Eric Strole
|
|
|
Call an hour before when on your way // Malloya Phone #: ###-####-Need to plumb per the 2009 ISPC
|