Final | 4/5/2016 | 4/6/2016 | 4/6/2016 | A | PASS |
Daryl Spivey
|
|
|
Danny Phone #: ###-####
|
Final | 3/8/2016 | 3/9/2016 | 3/9/2016 | A | FAIL |
Eric Strole
|
|
|
Julie Phone #: ###-####-Neeed to test pvc flue.Need to use primer. Need to run T&P to an approved location.Need to install c/o sensors. Cannot use an extension cord or adaptor on tankless. Per electrical inspector remove wire to old w/h and put hard lid over box.
|