Final | 5/12/2016 | 5/12/2016 | 5/12/2016 | P | PASS |
Daryl Spivey
|
|
|
asin is code to get in Phone #: ###-#### Inspection requested via web by Randy Powell
|
Plumbing Rough-in | 3/15/2016 | 3/16/2016 | 3/16/2016 | P | PASS |
Jim Little
|
|
|
Phone #: ###-#### Inspection requested via web by Randy Powell
|
Plumbing Rough-in | 3/15/2016 | 3/15/2016 | 3/15/2016 | P | NR |
Jim Little
|
|
|
Phone #: ###-#### Inspection requested via web by Randy Powell
|
Plumbing Rough-in | 3/9/2016 | 3/10/2016 | 3/10/2016 | A | FAIL |
Jim Little
|
|
|
Phone #: ###-#### Inspection requested via web by Randy Powell >3" building drain needs to grade @ 1/4" per foot. >2" to platform drain is backgraded >laundry sink wet vented onto platform drain needs to be 3".
|