Final | 4/22/2016 | 4/25/2016 | 4/25/2016 | A | PASS |
Jim Little
|
|
|
if questions call Ryan @ ###-#### Phone #: ###-#### Inspection requested via web by Stacia Haumann
|
Plumbing Rough-in | 4/1/2016 | 4/1/2016 | 4/1/2016 | P | PASS |
Jim Little
|
|
|
if questions call Ryan @ ###-#### Phone #: ###-#### Inspection requested via web by Stacia Haumann >corrections made
|
Plumbing Rough-in | 3/31/2016 | 3/31/2016 | 3/31/2016 | P | FAIL |
Jim Little
|
|
|
ROUGH-IN COVER. If questions call Ryan @ ###-#### Phone #: ###-#### Inspection requested via web by Stacia Haumann >Need city approved plans onsite >must be 6" above flood level rim before turning horizontal @ w/c's >need 10' head on dwv test. >cannot read test gauge on water that is 12' in the air and pointed towards ceiling.
|
Groundwork | 3/10/2016 | 3/11/2016 | 3/11/2016 | A | PASS |
Jim Little
|
|
|
if questions call Steve @ ###-#### Phone #: ###-#### Inspection requested via web by Stacia Haumann
|