Final | 7/12/2016 | 7/13/2016 | 7/13/2016 | A | PASS |
Jim Little
|
|
|
Please call for access if no other contractors are onsite. ###-####. Thanks. Phone #: ###-#### Inspection requested via web by Josh Johnson
|
Groundwork | 3/31/2016 | 4/1/2016 | 4/1/2016 | A | PASS |
Jim Little
|
|
|
Please give me a call when on the way. Thanks. Phone #: ###-#### Inspection requested via web by Josh Johnson >gw ok, no room for backwater valve, contractor chose not to install one elsewhere in basement.
|
Plumbing Rough-in | 3/18/2016 | 3/21/2016 | 3/21/2016 | A | PART |
Bill VanDegrift
|
|
|
Other contractors should be onsite. If not please give me a call and I will give you the lock box code. Thanks. Phone #: ###-#### Inspection requested via web by Josh Johnson ground floor ri ok basement incomplete
|
Other | 3/15/2016 | 3/16/2016 | 3/16/2016 | A | DONE |
Jim Little
|
|
|
Need consultation as per Jim Little. We should have some one there most of the day. Thanks. Phone #: ###-#### Inspection requested via web by Josh Johnson >ok to tie upstairs into 3" stack until basement gw is done
|