Final | 5/26/2016 | 5/27/2016 | 5/27/2016 | A | PASS |
Jim Little
|
|
|
Key is hidden in ceiling above front door. Also please inspect irrigation back-flow system in front of building. Phone #: ###-#### Inspection requested via web by chris mcdaniel >sprink tie in and backflow ok >corrections made inside
|
Final | 5/24/2016 | 5/25/2016 | 5/25/2016 | A | FAIL |
Jim Little
|
|
|
Key is hidden above front door in ceiling. Phone #: ###-#### Inspection requested via web by chris mcdaniel >need to add an expansion tank since backflow was added >Add ASSE 1070 conforming tempering device to lav per 413.1 ISPC
|
Final | 5/23/2016 | 5/24/2016 | 5/24/2016 | P | NR |
Jim Little
|
|
|
Key is above the front door in ceiling. Phone #: ###-#### Inspection requested via web by chris mcdaniel
|
Plumbing Rough-in | 3/30/2016 | 3/31/2016 | 3/31/2016 | P | PASS |
Jim Little
|
|
|
Call for access if no one is onsite. Phone #: ###-#### Inspection requested via web by chris mcdaniel >ri ok >DCVA will be needed for final
|