Final | 2/20/2017 | 2/21/2017 | 2/21/2017 | A | PASS |
Daryl Spivey
|
|
|
Phone #: ###-#### Inspection requested via web by Victoria Craig
|
PLM-Aging Inspection | 12/27/2016 | 12/27/2016 | 12/27/2016 | | PEND |
Daryl Spivey
|
|
|
wip
|
Plumbing Rough-in | 9/27/2016 | 9/28/2016 | 9/28/2016 | A | PASS |
Daryl Spivey
|
|
|
Rough-in for cover inspection. I won''t be able to be there, but if you need to get in touch with me and/or have questions, please call Brad at ###-####. Thanks Daryl Phone #: ###-#### Inspection requested via web by Victoria Craig
|
Groundwork | 7/19/2016 | 7/19/2016 | 7/19/2016 | P | PASS |
Daryl Spivey
|
|
|
For under subfloor DWV. Darrell, please text or call me if you have an estimated time -- my work is 10 minutes away. Thanks, Brad Phone #: ###-#### Inspection requested via web by Victoria Craig waste passed ok......ds
|
Water and/or Sewer | 5/31/2016 | 6/1/2016 | 6/1/2016 | A | CANC |
Daryl Spivey
|
|
|
If possible, please text/call with an estimated time. Consult/sign-off before foundation poured -- main H2O and DWS pipes ok for stem wall.to be poured. Thanks, Brad Phone #: ###-#### Inspection requested via web by Victoria Craig
|
Other | 6/1/2016 | 6/1/2016 | 6/1/2016 | A | PART |
Daryl Spivey
|
|
|
If possible, please text/call with an estimated time. Consult/sign-off before foundation poured -- main H2O and DWS pipes ok for stem wall.to be poured. conference only........ Thanks, Brad Phone #: ###-#### Inspection requested via web by Victoria Craig
|
Other | 5/9/2016 | 5/10/2016 | 5/10/2016 | A | DONE |
Daryl Spivey
|
|
|
Brad-conferense-please call 15 minutes prior to meet Phone #: ###-####
|
Other | 4/7/2016 | 4/8/2016 | 4/8/2016 | P | PASS |
Daryl Spivey
|
|
|
Call 15 before to meet // Victoria Phone #: ###-#### conference only
|