Final | 5/18/2016 | 5/23/2016 | 5/23/2016 | A | PASS |
Jim Little
|
|
|
Jacob Phone #: ###-####
|
Final | 5/18/2016 | 5/18/2016 | 5/18/2016 | P | FAIL |
Jim Little
|
|
|
Jacob Phone #: ###-#### >tempering valve needs to be installed correctly.
|
Final | 5/17/2016 | 5/18/2016 | 5/18/2016 | A | FAIL |
Jim Little
|
|
|
Jacob Phone #: ###-#### >add ASSE 1070 tempering device to public lav.
|
Plumbing Rough-in | 4/21/2016 | 4/22/2016 | 4/22/2016 | A | PART |
Jim Little
|
|
|
2993 // Jacob Phone #: ###-#### >RI ok to cover >need to see pipes capped for all demo sinks
|
Plumbing Rough-in | 4/20/2016 | 4/21/2016 | 4/21/2016 | A | FAIL |
Jim Little
|
|
|
Jacob Phone #: ###-#### >need to roll wc vent above centerline >increase wc vent to 3" to wet vent mop sink or tie in to a drain. >must be 6" above flood level of lav before turning horizontal. >need a test on dwv. >fix plm permit and address before reinspetion.
|