Final | 7/11/2016 | 7/12/2016 | 7/12/2016 | A | PASS |
Eric Strole
|
|
|
CHARLIE IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER
|
Final | 6/9/2016 | 6/9/2016 | 6/9/2016 | P | NR |
Eric Strole
|
|
|
CHARLIE IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER
|
Final | 6/6/2016 | 6/7/2016 | 6/7/2016 | P | PART |
Eric Strole
|
|
|
CHARLIE IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER-Need to show that tempering valves are 1070 approved. T&P on existing w/h needs an air-gap. RPBA on premis needs tested. Need seperate water line to soap dispensor at mop sink and need to install all equipment. Temp final ok.
|
Med/Gas Systems | 5/10/2016 | 5/10/2016 | 5/10/2016 | P | PASS |
Eric Strole
|
|
|
|
Med/Gas Systems | 5/9/2016 | 5/9/2016 | 5/9/2016 | P | PART |
Bill VanDegrift
|
|
|
start 24 hour test
|
Plumbing Rough-in | 5/9/2016 | 5/9/2016 | 5/9/2016 | P | PASS |
Bill VanDegrift
|
|
|
dwv test ok
|
Plumbing Rough-in | 5/6/2016 | 5/9/2016 | 5/9/2016 | A | NR |
Eric Strole
|
|
|
CHARLIE IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER-Need to test DWV and VAC.
|
Plumbing Rough-in | 4/20/2016 | 4/20/2016 | 4/20/2016 | P | PART |
Eric Strole
|
|
|
CHARLIE IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER-Inwall r/i pass.
|