Final | 8/25/2016 | 8/26/2016 | 8/26/2016 | P | PASS |
Eric Strole
|
|
|
Home will be open Phone #: ###-#### Inspection requested via web by Steve Spence
|
Plumbing Rough-in | 5/31/2016 | 5/31/2016 | 5/31/2016 | P | PASS |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Steve Spence
|
Plumbing Rough-in | 5/25/2016 | 5/26/2016 | 5/26/2016 | A | FAIL |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Steve Spence-DWV test fail. Need to plumb horizontal wet vent per 2009 ISPC. Need to fix flat section of 3" in basement overhead.
|
Groundwork | 4/25/2016 | 4/25/2016 | 4/25/2016 | P | PASS |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Steve Spence
|